
On the fifth day of the camp,
participants installed and commissioned the vision recognition module
and integrated it with the existing sensor system.
With that,
every functional module of the robot was in place.



Installing and Commissioning Vision Recognition
Each group mounted a camera above the robotic arm and aligned it with the workbench's picking area, adjusting its angle and height to cover the workspace. They then configured the color recognition algorithm to identify and classify red, yellow and blue blocks in real time.

To reduce errors caused by lighting differences and shadows, participants adjusted color thresholds and improved recognition stability under different lighting conditions.
Coordinate Transformation and Position Calibration
After the camera identifies a block's position, its image coordinates must be converted into motion coordinates that the robotic arm can use.

Groups placed blocks at different positions and established the relationship between image coordinates and robot coordinates. Repeated tests brought positioning performance to the level required for successful picking.
Coordinated Operation of All Sensors
The vision module was integrated with the existing sensors. The camera identified each block's color and position and sent coordinates to the arm for picking. A temperature sensor monitored the enclosure temperature and displayed it on an OLED screen, with an alarm for excessive temperature. Infrared detection triggered an emergency stop if someone entered the operating area. Ultrasonic sensing monitored the distance to objects below the descending arm and stopped further downward movement when the distance fell below the safety limit.

With the sensors working under a unified control logic, the robot could complete the full workflow from sensing and decision-making to action.


In five days,
participants progressed from their first programming exercises
to building a robot with vision recognition and automated picking,
temperature monitoring and two layers of safety protection:
a complete working system.
Together, we planted
a seed of scientific curiosity and innovation.
The end of the camp is not an endpoint,
but a new beginning.
We hope every participant will continue
to explore the possibilities of science and technology.


Mobile: +86 13077426880 | Instructor Wang
Address: Shishan Town, Nanhai District, Foshan, Guangdong, China
Wanyang Kexing Park, 84 Taoyuan East Road

