ZEKEEP
Call Us Now
Home / Company News / Article

ZEKEEP Robotics Camp Day 2: From Individual Components to a Fully Assembled Robotic Arm

Published: 2026-08-12 Publisher: ZEKEEP Views: 2

On the second day of the camp, participants completed their robotic arm assemblies and installed all the sensors. In just one day, a collection of separate components became a fully functioning robot. The transformation took only a day. Robotic Arm System Assembly Completed Each group independently


On the second day of the camp,

participants completed

their robotic arm assemblies

and installed all the sensors.


In just one day,

a collection of separate components became a fully functioning robot.

The transformation took only a day.



Robotic Arm System Assembly Completed

Each group independently assembled its robotic arm system and commissioned its communications. This was a complete engineering task involving circuit connections and coordination between two controllers.


Participants commission their robotic arms


By midday, every group could move its robot to specified coordinates, open and close the gripper, and run continuous action sequences. Accurate motion, stable gripping and smoothly coordinated steps demonstrated a complete motion control system.


Participants successfully instruct a robotic arm to pick up a block

Multiple Sensors Installed and Ready

The subsequent installation work covered temperature monitoring, distance measurement, obstacle detection and data display.


Participants connect wiring and test the system


Participants mounted, wired and calibrated five types of sensor. Tasks included displaying temperature readings on an OLED screen, using infrared obstacle detection to trigger an emergency stop, and adding ultrasonic distance sensing to protect the robot during downward movement. Each module passed an individual functional check, and all tasks were completed within the allotted time.


Participants secure sensors and connect their wiring

Engineering Checks and Commissioning Review

To finish the day, each group checked its work against the functional checklist, confirmed that all six major modules operated correctly, recorded commissioning notes and summarized outstanding issues. Participants completed every stage themselves, from wiring to parameter calibration.


END

Contact Us


Mobile: +86 13077426880 | Instructor Wang

Address: Shishan Town, Nanhai District, Foshan, Guangdong, China

Wanyang Kexing Park, 84 Taoyuan East Road


Related News

Related Articles

Free Consultation

Get Your Customized Automation Report

Tell us about your automation challenges. ZEKEEP's factory technical experts will provide a free automation feasibility and ROI assessment report within 2 hours.